HAUSE SEWER NETWORKsewers@hause.ca403-679-3100
NewSewerLines.com
Size

How a building sewer is sized for suites, duplexes and multiplexes

How a building sewer is sized in Canada: fixture units, the code capacity table by slope, the NPS 4 minimum, city minimums and worked examples.

Conceptual illustration of three sewer bores with a separate slope and whole-building fixture record
Illustrated field guideThree sewer bores with a separate slope and whole-building fixture recordFixture units · grade · city minimum · design
Short answer

A sanitary building sewer is sized by adding the hydraulic load of every fixture it serves, in fixture units, and reading the smallest pipe that carries that load at the available slope from National Plumbing Code Table 2.4.10.6.-C. The code sets NPS 4 as the minimum to a public sewer. For small multi-unit buildings the city's own minimum size or the slope often governs rather than the load.

Key takeaways
  • Load is counted in fixture units: 6 for a bathroom group with a tank toilet, 1.5 for a kitchen sink, 2 for a clothes washer, 3 for a floor drain with an NPS 3 trap.
  • Capacity depends on size and slope together: a 4-inch sewer carries 180 fixture units at 1 in 100 and 240 at 1 in 50.
  • No building sewer to a public sewer may be smaller than NPS 4 downstream of the main cleanout.
  • Flatter than 1 in 100, a 4-inch pipe is not permitted at all; a shallow tie-in can force a larger pipe.
  • Ontario applies its own Building Code, and many cities publish minimum service sizes above the code floor.
Building sewer capacity in fixture units by pipe size and slopeA grid from National Plumbing Code of Canada 2020 Table 2.4.10.6.-C. Rows are pipe sizes NPS 3, 4, 5, 6 and 8; columns are slopes from 1 in 200 to 1 in 25. A 3-inch pipe carries 27 fixture units at 1 in 50 and 36 at 1 in 25. A 4-inch pipe carries 180 at 1 in 100, 240 at 1 in 50 and 300 at 1 in 25. A 5-inch pipe carries 380 to 670, a 6-inch pipe 600 to 1,300, and an 8-inch pipe 1,400 to 3,370. Dashes mean the size is not permitted at that slope. 1 in 2001 in 1331 in 1001 in 501 in 25 SIZE NPS 3———2736NPS 4——180240300NPS 5—380390480670NPS 6—6007008401,300NPS 81,4001,5001,6002,2503,370 MAX. LOAD IN FIXTURE UNITS · NPC 2020 TABLE 2.4.10.6.-C · SANITARY BUILDING SEWER STEEPER → MORE CAPACITY To a public sewer: at least NPS 4 downstream of the main cleanout (2.4.9.4).Many cities set a larger minimum for multi-unit services. Ask yours.
Fig. 1National Plumbing Code 2020 Table 2.4.10.6.-C: the most fixture units a sanitary building drain or sewer may carry, by pipe size and slope. Blank cells are not permitted at that slope.

01 /What is a fixture unit?

A fixture unit is the plumbing code's measure of how much load a fixture puts on the drainage system, allowing for how much it discharges, how fast and how often. It is not a litre or a flow rate; it is a weighting that lets very different fixtures be added together. The values for common fixtures are set in Table 2.4.9.3 of the National Plumbing Code of Canada 2020.

Selected hydraulic loads, NPC 2020 Table 2.4.9.3 (fixture units)
FixtureFixture unitsNote
Bathroom group with flush tank (toilet, basin, tub or shower)68 with a direct flush valve
Water closet with flush tank, on its own46 with a direct flush valve
Domestic lavatory (basin)11 with an NPS 1¼ trap; 1.5 with an NPS 1½ trap
Domestic kitchen sink, with or without grinder1.5Single, double or two with a common trap
Domestic dishwasher1.5No load when connected to a grinder or domestic sink
Domestic clothes washer2No extra allowance when it drains to a laundry tray
Bathtub, with or without shower1.5
Shower drain, heads under 9.5 L/min in total1.53 at 9.5 to 20 L/min; 6 over 20 L/min
Laundry tray, single or double1.52 for three compartments
Floor drain2 or 32 with an NPS 2 trap, 3 with an NPS 3 trap; none for emergency floor drains

A pump or other continuous-flow fixture is counted differently: 31.7 fixture units for each litre per second of flow when it discharges to a sanitary drain (Sentence 2.4.10.3.(1)). And fixtures planned for future connection count now, under Article 2.4.10.1.

02 /How do you read the capacity table?

Table 2.4.10.6.-C gives the maximum load, in fixture units, that a sanitary building drain or building sewer may carry, by nominal pipe size and slope. Find the column for your slope, go down to the first row whose number equals or exceeds your load, and that row is the smallest permitted size. A dash means the size is not permitted at that slope.

Building sewer capacity in fixture units by pipe size and slopeA grid from National Plumbing Code of Canada 2020 Table 2.4.10.6.-C. Rows are pipe sizes NPS 3, 4, 5, 6 and 8; columns are slopes from 1 in 200 to 1 in 25. A 3-inch pipe carries 27 fixture units at 1 in 50 and 36 at 1 in 25. A 4-inch pipe carries 180 at 1 in 100, 240 at 1 in 50 and 300 at 1 in 25. A 5-inch pipe carries 380 to 670, a 6-inch pipe 600 to 1,300, and an 8-inch pipe 1,400 to 3,370. Dashes mean the size is not permitted at that slope. 1 in 2001 in 1331 in 1001 in 501 in 25 SIZE NPS 3———2736NPS 4——180240300NPS 5—380390480670NPS 6—6007008401,300NPS 81,4001,5001,6002,2503,370 MAX. LOAD IN FIXTURE UNITS · NPC 2020 TABLE 2.4.10.6.-C · SANITARY BUILDING SEWER STEEPER → MORE CAPACITY To a public sewer: at least NPS 4 downstream of the main cleanout (2.4.9.4).Many cities set a larger minimum for multi-unit services. Ask yours.
Fig. 2NPC 2020 Table 2.4.10.6.-C for NPS 3 to 8. Steeper grades carry more; flat grades rule out the smaller sizes entirely.
Maximum load in fixture units, NPC 2020 Table 2.4.10.6.-C (extract)
Size1 in 2001 in 1331 in 1001 in 501 in 25
NPS 3———2736
NPS 4——180240300
NPS 5—380390480670
NPS 6—6007008401,300
NPS 81,4001,5001,6002,2503,370

Slopes are written as a ratio: 1 in 100 is 1 percent, or 10 mm of fall per metre of run; 1 in 50 is 2 percent, 20 mm per metre. Drainage pipes of NPS 3 or less need at least 1 in 50 under Article 2.4.8.1.

03 /What is the minimum size of a building sewer?

NPS 4, where it connects to a public sewer. Article 2.4.9.4 requires building drains and building sewers connected to the public sewer system downstream of the main cleanout to be at least NPS 4. Article 2.4.9.2 adds that drainage pipes serving a water closet must be at least NPS 3, and branches and building drains downstream of the third water-closet connection at least NPS 4.

Cities often go higher for the public connection, and their number is the one your application will be checked against. As checked in September 2026: Toronto's online application for buildings of up to 5 units covers a 150 mm sewer connection, and larger services go through a separate process; Ottawa's 2007 infill specification shows a 125 mm PVC sanitary service; Saskatoon's construction specification sets a 100 mm sanitary minimum. Ask your city for its current minimum and use the larger of the code result and the city number.

04 /How do the numbers work for real buildings?

These examples use the fixture mixes behind the fixture load estimator presets. They are illustrative; count your own drawings.

Worked sizing examples at 1 in 100 (NPC Table 2.4.10.6.-C)
BuildingLoadSmallest code size at 1 in 100Share of NPS 4 capacity
House: 2 bathrooms, powder room, kitchen, washer, floor drain23.5 FUNPS 413%
House with a suite33 FUNPS 418%
Duplex, two such units, two floor drains47 FUNPS 426%
Fourplex: 2 bathrooms, kitchen, washer per unit, two floor drains68 FUNPS 438%
Sixplex, same units99 FUNPS 455%
Four units plus four suites, four floor drains112 FUNPS 462%

The lesson is that at missing-middle scale the plumbing code's capacity rarely forces a pipe larger than 4 inches. What forces a larger pipe is a city minimum, a grade flatter than 1 in 100 because the tie-in is shallow and the run long, or a genuinely larger building. If the only slope available is 1 in 133, even the 23.5 FU house needs NPS 5, because NPS 4 is not permitted that flat.

05 /Is fixture-unit sizing the whole story?

No. The table tells you the smallest pipe the code allows for a sound pipe laid on a steady grade. Four other things decide what actually works.

  • Condition. Roots, offsets, sags and cracks reduce what an existing pipe carries. That is why reuse decisions rest on camera video, not on size.
  • Grade you can get. The building drain's depth at the wall and the tie-in invert fix the fall. If there is not enough, the answer is a larger pipe at a flatter permitted slope, a deeper tie-in, or pumping the lowest fixtures.
  • Storm load. Storm and combined building sewers are sized by rainfall load under a different table (2.4.10.9), not by fixture units. Most new buildings keep them separate.
  • Future plans. A roughed-in bathroom or a planned suite counts now. Sizing for the finished building avoids digging twice.
Whole-building fixture units for six example buildings against building sewer capacityHorizontal bars show hydraulic load in fixture units for six example buildings: a single house at 23.5, a house with a secondary suite at 33, a duplex at 47, a fourplex at 68, a sixplex at 99 and four units with four suites at 112. Vertical lines mark National Plumbing Code capacities for a 4-inch building sewer: 180 fixture units at 1 in 100 and 240 at 1 in 50. The fixture mixes are illustrative; count your own drawings. Single house23.5 FUHouse + suite33 FUDuplex47 FUFourplex68 FUSixplex99 FU4 units + 4 suites112 FU NPS 4 AT 1 IN 100180 FUNPS 4 AT 1 IN 50240 FU WHOLE-BUILDING LOAD, FIXTURE UNITS (NPC TABLE 2.4.9.3) · EXAMPLE MIXES, ILLUSTRATIVE At this scale, condition and city rules decide more often than pipe size.
Fig. 3Load climbing across six example buildings, with the two NPS 4 capacities marked. The gap between the bars and the lines is room for future fixtures.

06 /Who signs off on the size?

The designer proposes it, the permit office checks it against the code, and the utility checks the public connection against its own standard. On house-scale work the plumbing contractor often prepares the fixture count; on multiplexes an engineer usually does, and several cities, including Vancouver for multiplexes and Edmonton for three or more units, require an engineer's drawings. Bring the fixture total and the proposed slope to the first conversation, and expect the city to answer with its minimum. Keep the fixture schedule with the permit set: if a suite or bathroom is added later, the same count shows at once whether the building sewer still has room.

Run your building through the fixture load estimator, check whether the old service can stay, and use the Service Connection Planner for the city route. When the size is settled, request quotes on that basis.

FAQQuestions people ask

How do you calculate fixture units for a building sewer?

Count every fixture the sewer serves, multiply each by its value in NPC Table 2.4.9.3, add continuous flows at 31.7 fixture units per litre per second and any future fixtures, and total them.

What is the minimum building sewer size in Canada?

NPS 4 downstream of the main cleanout where it connects to a public sewer, under NPC Article 2.4.9.4. Many cities set a larger minimum for their connection.

What slope does a 4 inch sewer need?

At least 1 in 100, or 10 mm per metre; the code table gives it no capacity at flatter grades. At 1 in 100 it carries up to 180 fixture units.

When does a building need a 6 inch sewer?

When the load exceeds what NPS 4 or 5 carries at the available slope, when the grade is too flat for smaller sizes, or when the city requires 150 mm for the connection, as Toronto's up-to-5-unit route does.

Are storm sewers sized with fixture units?

No. Storm and combined building sewers are sized by rainfall load in litres under NPC Table 2.4.10.9; fixture units apply to sanitary drainage.

Does Ontario use the same sewer sizing tables?

Ontario applies the Ontario Building Code's plumbing part rather than the National Plumbing Code directly. The method is the same kind; confirm the governing values locally.

NETWORKGo deeper across the HAUSE Sewer network

Request quotes

Describe the problem once. Get a straight answer.

Send the symptoms and anything you already know — age of the house, what a camera found, what you have been quoted. The HAUSE Sewer desk replies with next steps and, where available, a local contractor for the job.

Sewage backing up right now? Stop using water, keep people away from the water, and do not touch electrical equipment near it.

Tell us about the job

Free request. We read every one and reply by email or phone.

HAUSE Sewer is an independent network, not a contractor. See our privacy notice.

The HAUSE Sewer network

One sewer line, every angle.